September
The proponent requested authorization to:
- Construct up to 675 new drill sites
- Drill up to 965 exploration holes
- Construct up to 33 acres of water conveyance and storage facilities
- Develop up to eight acres of ancillary disturbance
- Construct up to 72.3 miles (380,810 linear feet) of new drill roads
- Utilize up to 20 drill rigs simultaneously, 24/7